Cargando…

The neutrino's road to Gran Sasso gets ready!

<b>The decay tunnel for CNGS has just been finished. This is a big step for the project. Since last July, some 2,700 metres have been excavated. These include access galleries, the TT41 transfer line for protons, the target chamber and the decay tunnel.</b>

Detalles Bibliográficos
Lenguaje:eng
fre
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/45605
Descripción
Sumario:<b>The decay tunnel for CNGS has just been finished. This is a big step for the project. Since last July, some 2,700 metres have been excavated. These include access galleries, the TT41 transfer line for protons, the target chamber and the decay tunnel.</b>