Cargando…
The neutrino's road to Gran Sasso gets ready!
<b>The decay tunnel for CNGS has just been finished. This is a big step for the project. Since last July, some 2,700 metres have been excavated. These include access galleries, the TT41 transfer line for protons, the target chamber and the decay tunnel.</b>
Lenguaje: | eng fre |
---|---|
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/45605 |
Ejemplares similares
-
Developments at the Gran Sasso laboratory
Publicado: (2003) -
CNGS: Opening the way to Gran Sasso
Publicado: (2003) -
The CERN-Gran Sasso Neutrino Program
por: Duchesneau, D.
Publicado: (2002) -
CNGS - CERN Neutrinos to GRAN SASSO
por: Elsener, K
Publicado: (2000) -
CERN Neutrino beam to Gran Sasso
por: Elsener, K
Publicado: (2000)