Cargando…
Design of a 3 GHz Accelerator Structure for the CLIC Test Facility (CTF 3) Drive Beam
For the CLIC two-beam scheme, a high-current, long-pulse drive beam is required for RF power generation. Taking advantage of the 3 GHz klystrons available at the LEP injector once LEP stops, a 180 MeV electron accelerator is being constructed for a nominal beam current of 3.5 A and 1.5 ms pulse leng...
Autores principales: | Carron, G., Jensen, E., Luong, M., Millich, A., Rugo, E., Syratchev, I., Thorndahl, L. |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/456935 |
Ejemplares similares
-
Design of a 3 GHz accelerator structure for the CLIC test facility (CTF 3) drive beam
por: Carron, G, et al.
Publicado: (2000) -
The 30 GHz transfer structure for the CLIC study
por: Carron, G, et al.
Publicado: (1998) -
The 30 GHz transfer structure for the CLIC study
por: Carron, G, et al.
Publicado: (1998) -
Review of the Drive Beam Stabilization in the CLIC Test Facility CTF3
por: Dubrovskiy, A, et al.
Publicado: (2013) -
Considerations on the Design of the Decelerator of the CLIC Test Facility (CTF3)
por: Schulte, Daniel, et al.
Publicado: (2005)