Cargando…

Beam Dynamics for the CTF3 Preliminary Phase

In the framework of the CLIC RF power source studies, the new scheme of electron pulse compression and bunch frequency multiplication, using injection by RF deflectors into an isochronous ring, will be tested at CERN during the CTF3 preliminary phase. The present LPI complex will be modified in orde...

Descripción completa

Detalles Bibliográficos
Autores principales: Corsini, R, Ferrari, A, Rinolfi, Louis, Risselada, Thys, Royer, P, Tecker, F A
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/485600
_version_ 1780896929073332224
author Corsini, R
Ferrari, A
Rinolfi, Louis
Risselada, Thys
Royer, P
Tecker, F A
author_facet Corsini, R
Ferrari, A
Rinolfi, Louis
Risselada, Thys
Royer, P
Tecker, F A
author_sort Corsini, R
collection CERN
description In the framework of the CLIC RF power source studies, the new scheme of electron pulse compression and bunch frequency multiplication, using injection by RF deflectors into an isochronous ring, will be tested at CERN during the CTF3 preliminary phase. The present LPI complex will be modified in order to allow a test of this scheme at low charge. The design of the new front-end, of the modified linac, of the matched transfer line, and of the isochronous ring lattice is presented here.The results of the related beam dynamics studies are also discussed.
id cern-485600
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2001
record_format invenio
spelling cern-4856002023-08-17T09:44:56Zhttp://cds.cern.ch/record/485600engCorsini, RFerrari, ARinolfi, LouisRisselada, ThysRoyer, PTecker, F ABeam Dynamics for the CTF3 Preliminary PhaseAccelerators and Storage RingsIn the framework of the CLIC RF power source studies, the new scheme of electron pulse compression and bunch frequency multiplication, using injection by RF deflectors into an isochronous ring, will be tested at CERN during the CTF3 preliminary phase. The present LPI complex will be modified in order to allow a test of this scheme at low charge. The design of the new front-end, of the modified linac, of the matched transfer line, and of the isochronous ring lattice is presented here.The results of the related beam dynamics studies are also discussed.CERN-OPEN-2001-003CLIC-Note-470oai:cds.cern.ch:4856002001-01-31
spellingShingle Accelerators and Storage Rings
Corsini, R
Ferrari, A
Rinolfi, Louis
Risselada, Thys
Royer, P
Tecker, F A
Beam Dynamics for the CTF3 Preliminary Phase
title Beam Dynamics for the CTF3 Preliminary Phase
title_full Beam Dynamics for the CTF3 Preliminary Phase
title_fullStr Beam Dynamics for the CTF3 Preliminary Phase
title_full_unstemmed Beam Dynamics for the CTF3 Preliminary Phase
title_short Beam Dynamics for the CTF3 Preliminary Phase
title_sort beam dynamics for the ctf3 preliminary phase
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/485600
work_keys_str_mv AT corsinir beamdynamicsforthectf3preliminaryphase
AT ferraria beamdynamicsforthectf3preliminaryphase
AT rinolfilouis beamdynamicsforthectf3preliminaryphase
AT risseladathys beamdynamicsforthectf3preliminaryphase
AT royerp beamdynamicsforthectf3preliminaryphase
AT teckerfa beamdynamicsforthectf3preliminaryphase