Cargando…
Electrical Network Supervisor Status Report
During year 2000 CERN has installed the Electrical Network Supervisor (ENS) for the monitoring and control of the equipment of the electrical distribution network located in about 100 substations throughout the different sites. In the first phase the system has been installed in parallel with the or...
Autor principal: | Poulsen, S |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/490014 |
Ejemplares similares
-
TCR as supervisor of technical systems
por: Laeger, H
Publicado: (1998) -
An Industrial Control System for the Supervision of the CERN Electrical Distribution Network
por: Poulsen, S
Publicado: (2000) -
LHC Electrical Installations: Status Report
por: Pedersen, J
Publicado: (2000) -
Proposal for an extension of the contract for the supply of an electrical network supervisor for the CERN electrical distribution network
Publicado: (1999) -
Proposal for the Award of a Contract for the Supply of an Electrical Network Supervisor for the CERN Electrical Distribution Network
Publicado: (1998)