Cargando…
Powering the Transfer Lines TI2 and TI8
Electrical power for the transfer tunnels will be distributed from the LHC side and the SPS side. For the injection tunnel TI2, buildings LHC SR2, SPS BA6 and BA7 will be used to house the power converters and MV/LV switchboards. Galleries and ducts will facilitate cabling between power transformers...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/490015 |