Cargando…

Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC

The control system implementation for the cooling and ventilation facilities connected to the LHC Project relies on the technical and human resources that are organised within large-size industrial contracts. Beside the technical aspects, the follow-up of the implementation activities in the framewo...

Descripción completa

Detalles Bibliográficos
Autores principales: Body, Y, Jena, H, Morodo, M C
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/490017
Descripción
Sumario:The control system implementation for the cooling and ventilation facilities connected to the LHC Project relies on the technical and human resources that are organised within large-size industrial contracts. Beside the technical aspects, the follow-up of the implementation activities in the framework of such contracts also involves a managerial effort in order to achieve a flexible and coherent control system. The purpose is to assure precise and reliable regulation together with accurate local and remote supervision in conformity with the operational requirements. These objectives can only be reached by a systematic approach that keeps the co-ordination between the in-house and external cross-disciplinary teams as well as the fulfilment of the validation procedures and the contractual formalities. The case that here illustrates this approach is the control system implementation for the heating, ventilation and air conditioning of the LHC surface buildings, which shall extend up to 2004.