Cargando…

Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC

The control system implementation for the cooling and ventilation facilities connected to the LHC Project relies on the technical and human resources that are organised within large-size industrial contracts. Beside the technical aspects, the follow-up of the implementation activities in the framewo...

Descripción completa

Detalles Bibliográficos
Autores principales: Body, Y, Jena, H, Morodo, M C
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/490017
_version_ 1780897028601020416
author Body, Y
Jena, H
Morodo, M C
author_facet Body, Y
Jena, H
Morodo, M C
author_sort Body, Y
collection CERN
description The control system implementation for the cooling and ventilation facilities connected to the LHC Project relies on the technical and human resources that are organised within large-size industrial contracts. Beside the technical aspects, the follow-up of the implementation activities in the framework of such contracts also involves a managerial effort in order to achieve a flexible and coherent control system. The purpose is to assure precise and reliable regulation together with accurate local and remote supervision in conformity with the operational requirements. These objectives can only be reached by a systematic approach that keeps the co-ordination between the in-house and external cross-disciplinary teams as well as the fulfilment of the validation procedures and the contractual formalities. The case that here illustrates this approach is the control system implementation for the heating, ventilation and air conditioning of the LHC surface buildings, which shall extend up to 2004.
id cern-490017
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2001
record_format invenio
spelling cern-4900172019-09-30T06:29:59Zhttp://cds.cern.ch/record/490017engBody, YJena, HMorodo, M CControl System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHCEngineeringThe control system implementation for the cooling and ventilation facilities connected to the LHC Project relies on the technical and human resources that are organised within large-size industrial contracts. Beside the technical aspects, the follow-up of the implementation activities in the framework of such contracts also involves a managerial effort in order to achieve a flexible and coherent control system. The purpose is to assure precise and reliable regulation together with accurate local and remote supervision in conformity with the operational requirements. These objectives can only be reached by a systematic approach that keeps the co-ordination between the in-house and external cross-disciplinary teams as well as the fulfilment of the validation procedures and the contractual formalities. The case that here illustrates this approach is the control system implementation for the heating, ventilation and air conditioning of the LHC surface buildings, which shall extend up to 2004.CERN-ST-2001-021oai:cds.cern.ch:4900172001-01-31
spellingShingle Engineering
Body, Y
Jena, H
Morodo, M C
Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC
title Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC
title_full Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC
title_fullStr Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC
title_full_unstemmed Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC
title_short Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC
title_sort control system implementation and follow-up within the cooling and ventilation contracts for the lhc
topic Engineering
url http://cds.cern.ch/record/490017
work_keys_str_mv AT bodyy controlsystemimplementationandfollowupwithinthecoolingandventilationcontractsforthelhc
AT jenah controlsystemimplementationandfollowupwithinthecoolingandventilationcontractsforthelhc
AT morodomc controlsystemimplementationandfollowupwithinthecoolingandventilationcontractsforthelhc