Cargando…
Construction Progress of the Cooling and Ventilation in the LHC Project
The Cooling and Ventilation Group has started the LHC construction work in September 1999 and will get into full activity when LEP will be stopped and dismantled: in total 12 major contracts for an amount of about 120 MCHF will be established to build the needed installations for the LHC. The author...
Autor principal: | Nonis, M |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/490023 |
Ejemplares similares
-
Cooling and Ventilation Studies for the CLIC
por: Cabral, Pedro, et al.
Publicado: (2019) -
Construction progress of the cooling & ventilation in the LHC project
por: Body, Y, et al.
Publicado: (2002) -
Cooling and ventilation for LHC/RF
por: Rödel, V
Publicado: (2000) -
Integration of the Process Control Systems for the Automation of the LHC Cooling and Ventilation Plants
por: Blanc, D
Publicado: (2003) -
Cooling and ventilation for the LHC: status report
por: Wilhelmsson, M
Publicado: (1999)