Civil Engineering Dispute Resolution
Construction work on the civil engineering contract started at Point 5 in August 1998. The new surface buildings and underground structures are necessary to accommodate the CMS detector for the LHC Project. The principal underground works consist of two new shafts, two parallel caverns separated by...
Autor principal: | Osborne, J |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/490025 |
Ejemplares similares
-
Construction dispute research: conceptualisation, avoidance and resolution
por: Cheung, Sai
Publicado: (2014) -
Contract Management of LHC Civil Engineering at Point 5
por: Osborne, J A
Publicado: (1999) -
Civil engineering status report for the ATLAS & CMS worksites
por: Rammer, H, et al.
Publicado: (2003) -
The construction of the LHC: civil engineering highlights
por: Baldy, Jean-Luc, et al.
Publicado: (2009) -
Civil engineering studies for major projects after LHC
por: Osborne, John, et al.
Publicado: (2011)