Cargando…
Achievements and Future Plans of CLIC Test Facilities
CTF2 was originally designed to demonstrate the feasibility of two-beam acceleration with high current drive beams and a string of 30 GHz CLIC accelerating structure prototypes (CAS). This goal was achieved in 1999 and the facility has since been modified to focus on high gradient testing of CAS...
Autor principal: | Braun, Hans Heinrich |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/496918 |
Ejemplares similares
-
Achievements and Future Plans of CLIC Test Facilities
por: Braun, H H
Publicado: (2001) -
The CLIC test facility
por: Braun, Hans Heinrich
Publicado: (1997) -
CLIC R&D: Technology, Test Facilities and Future Plans
por: Corsini, R
Publicado: (2006) -
Nulling Emittance Measurement Technique for CLIC Test Facility
por: Braun, Hans Heinrich, et al.
Publicado: (1997) -
An injector for the CLIC test Facility (CTF3)
por: Braun, Hans-Heinrich, et al.
Publicado: (2008)