Cargando…
Consolidation project of the electrostatic septa in the CERN PS ring
After almost two decades of reliable service, the electrostatic septa of the CERN PS complex need to be upgraded. This is to fulfil the increased requirements on vacuum performance and the need to reduce the time spent on maintenance interventions. Two electrostatic septa are used in the PS ring: se...
Autores principales: | Borburgh, J, Hourican, M, Thivent, M |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/505714 |
Ejemplares similares
-
Consolidation project of the electrostatic septa in the CERN PS ring
por: Borburgh, J, et al.
Publicado: (2001) -
Final Results on the CERN PS Electrostatic Septa Consolidation Program
por: Borburgh, Jan, et al.
Publicado: (2003) -
A new set of magnetic septa in the CERN PS complex
por: Borburgh, J, et al.
Publicado: (1999) -
A new set of magnetic septa in the CERN PS complex
por: Borburgh, J, et al.
Publicado: (1999) -
Design and Development of Separation Septa for the CERN PS Booster Upgrade
por: Hourican, M, et al.
Publicado: (2012)