Cargando…

Beam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3)

In the framework of the CLIC (Compact Linear Collider) RF power source studies, the scheme of electron pulse compression and bunch frequency mulitiplication, using injection by RF deflectors into an isochronous ring, will be tested, at low charge, during the preliminary phase of the new CLIC Test Fa...

Descripción completa

Detalles Bibliográficos
Autores principales: Corsini, R, Ferrari, A, Rinolfi, Louis, Risselada, Thys, Royer, P, Tecker, F A
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/507271
_version_ 1780897402012565504
author Corsini, R
Ferrari, A
Rinolfi, Louis
Risselada, Thys
Royer, P
Tecker, F A
author_facet Corsini, R
Ferrari, A
Rinolfi, Louis
Risselada, Thys
Royer, P
Tecker, F A
author_sort Corsini, R
collection CERN
description In the framework of the CLIC (Compact Linear Collider) RF power source studies, the scheme of electron pulse compression and bunch frequency mulitiplication, using injection by RF deflectors into an isochronous ring, will be tested, at low charge, during the preliminary phase of the new CLIC Test Facility (CTF3) at CERN. In this paper, we describe the beam dynamics studies made in order to assess the feasibility of the bunch combination experiment, as well as the related beam measurements performed on the LEP Pre-Injector complex (LPI) before its transformation into CTF3
id cern-507271
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2001
record_format invenio
spelling cern-5072712023-08-17T09:45:01Zhttp://cds.cern.ch/record/507271engCorsini, RFerrari, ARinolfi, LouisRisselada, ThysRoyer, PTecker, F ABeam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3)Accelerators and Storage RingsIn the framework of the CLIC (Compact Linear Collider) RF power source studies, the scheme of electron pulse compression and bunch frequency mulitiplication, using injection by RF deflectors into an isochronous ring, will be tested, at low charge, during the preliminary phase of the new CLIC Test Facility (CTF3) at CERN. In this paper, we describe the beam dynamics studies made in order to assess the feasibility of the bunch combination experiment, as well as the related beam measurements performed on the LEP Pre-Injector complex (LPI) before its transformation into CTF3CERN-PS-2001-032-AECLIC-Note-486oai:cds.cern.ch:5072712001-06-29
spellingShingle Accelerators and Storage Rings
Corsini, R
Ferrari, A
Rinolfi, Louis
Risselada, Thys
Royer, P
Tecker, F A
Beam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3)
title Beam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3)
title_full Beam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3)
title_fullStr Beam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3)
title_full_unstemmed Beam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3)
title_short Beam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3)
title_sort beam dynamics for the preliminary phase of the new clic test facility (ctf3)
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/507271
work_keys_str_mv AT corsinir beamdynamicsforthepreliminaryphaseofthenewclictestfacilityctf3
AT ferraria beamdynamicsforthepreliminaryphaseofthenewclictestfacilityctf3
AT rinolfilouis beamdynamicsforthepreliminaryphaseofthenewclictestfacilityctf3
AT risseladathys beamdynamicsforthepreliminaryphaseofthenewclictestfacilityctf3
AT royerp beamdynamicsforthepreliminaryphaseofthenewclictestfacilityctf3
AT teckerfa beamdynamicsforthepreliminaryphaseofthenewclictestfacilityctf3