The Preparation of the Cryomagnets and the Assembly of the LHC Test String 2
The numerous complex activities required to prepare the cryomagnets for the installation in String 2 are described. These include the configuration of the mechanical interfaces, thee conditioning of the beam tubes, the installation of beam screens and the instrumentation as well as the final checks....
Autores principales: | Andujar, O, Bozzini, D, Calzas-Rodriguez, C, Cruikshank, P, Desebe, O, Dobers, T, Jacquemod, A, Kos, N, Lepeule, P, Maan, W, Missiaen, D, Parma, Vittorio, Riddone, G, Rodríguez-Mateos, F, Rohmig, P, Saban, R I, Schneider, G, Serio, L, Skoczen, Blazej, Tock, J P, Veness, R J M, Vuitton, C |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/514341 |
Ejemplares similares
-
The Interconnections of the LHC Cryomagnets
por: Jacquemod, A, et al.
Publicado: (2001) -
Installation of beam screens in LHC arc cryomagnets
por: Cruikshank, P, et al.
Publicado: (1999) -
The Interconnections of the LHC Cryomagnets at CERN: Strategy Applied and First Results of the Industrialization Process
por: Tock, J P, et al.
Publicado: (2008) -
Organisation of the interconnections of the cryomagnets in the LHC tunnel
por: Tock, J P
Publicado: (2003) -
The Special LHC Interconnections: Technologies, Organization and Quality Control
por: Tock, J P, et al.
Publicado: (2008)