The Commissioning of the LHC Test String 2

String 2 [1,2] is a full-size model of an LHC cell of the regular part of the arc. It is composed of six dipole magnets with their correctors, two short straight sections with their orbit and lattice corrector magnets, and a cryogenic distribution line running alongside the magnets. The commissionin...

Descripción completa

Detalles Bibliográficos
Autores principales: Bordry, Frederick, Bozzini, D, Casas-Cubillos, J, Cruikshank, P, Dahlerup-Petersen, K, Denz, R, Herzog, R, Puccio, B, Rodríguez-Mateos, F, Saban, R I, Schmidt, R, Serio, L
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/514342
_version_ 1780897587769901056
author Bordry, Frederick
Bozzini, D
Casas-Cubillos, J
Cruikshank, P
Dahlerup-Petersen, K
Denz, R
Herzog, R
Puccio, B
Rodríguez-Mateos, F
Saban, R I
Schmidt, R
Serio, L
author_facet Bordry, Frederick
Bozzini, D
Casas-Cubillos, J
Cruikshank, P
Dahlerup-Petersen, K
Denz, R
Herzog, R
Puccio, B
Rodríguez-Mateos, F
Saban, R I
Schmidt, R
Serio, L
author_sort Bordry, Frederick
collection CERN
description String 2 [1,2] is a full-size model of an LHC cell of the regular part of the arc. It is composed of six dipole magnets with their correctors, two short straight sections with their orbit and lattice corrector magnets, and a cryogenic distribution line running alongside the magnets. The commissioning of String 2 Phase 1, with one half-cell and the following quadrupole, has started in April 2001. As for String 1 [3], the facility was built to individually validate the LHC systems and to investigate their collective behaviour during normal operation (pump-down, cool-down and powering) as well as during exceptional conditions such as quenches. String 2 is a stepping stone towards the commissioning of the first sector (one eight of LHC) planned for 2004. It is expected to yield precious information on the infrastructures, the installation, the tooling and the procedures for the assembly, the testing and the commissioning of the individual systems, as well as the global commissioning of the technical systems. This paper describes the procedures followed for the commissioning and details the preparation for the first cool-down and for the powering.
id cern-514342
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2001
record_format invenio
spelling cern-5143422023-05-31T13:21:00Zhttp://cds.cern.ch/record/514342engBordry, FrederickBozzini, DCasas-Cubillos, JCruikshank, PDahlerup-Petersen, KDenz, RHerzog, RPuccio, BRodríguez-Mateos, FSaban, R ISchmidt, RSerio, LThe Commissioning of the LHC Test String 2Accelerators and Storage RingsString 2 [1,2] is a full-size model of an LHC cell of the regular part of the arc. It is composed of six dipole magnets with their correctors, two short straight sections with their orbit and lattice corrector magnets, and a cryogenic distribution line running alongside the magnets. The commissioning of String 2 Phase 1, with one half-cell and the following quadrupole, has started in April 2001. As for String 1 [3], the facility was built to individually validate the LHC systems and to investigate their collective behaviour during normal operation (pump-down, cool-down and powering) as well as during exceptional conditions such as quenches. String 2 is a stepping stone towards the commissioning of the first sector (one eight of LHC) planned for 2004. It is expected to yield precious information on the infrastructures, the installation, the tooling and the procedures for the assembly, the testing and the commissioning of the individual systems, as well as the global commissioning of the technical systems. This paper describes the procedures followed for the commissioning and details the preparation for the first cool-down and for the powering.LHC-Project-Report-480CERN-LHC-Project-Report-480oai:cds.cern.ch:5143422001-08-06
spellingShingle Accelerators and Storage Rings
Bordry, Frederick
Bozzini, D
Casas-Cubillos, J
Cruikshank, P
Dahlerup-Petersen, K
Denz, R
Herzog, R
Puccio, B
Rodríguez-Mateos, F
Saban, R I
Schmidt, R
Serio, L
The Commissioning of the LHC Test String 2
title The Commissioning of the LHC Test String 2
title_full The Commissioning of the LHC Test String 2
title_fullStr The Commissioning of the LHC Test String 2
title_full_unstemmed The Commissioning of the LHC Test String 2
title_short The Commissioning of the LHC Test String 2
title_sort commissioning of the lhc test string 2
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/514342
work_keys_str_mv AT bordryfrederick thecommissioningofthelhcteststring2
AT bozzinid thecommissioningofthelhcteststring2
AT casascubillosj thecommissioningofthelhcteststring2
AT cruikshankp thecommissioningofthelhcteststring2
AT dahleruppetersenk thecommissioningofthelhcteststring2
AT denzr thecommissioningofthelhcteststring2
AT herzogr thecommissioningofthelhcteststring2
AT pucciob thecommissioningofthelhcteststring2
AT rodriguezmateosf thecommissioningofthelhcteststring2
AT sabanri thecommissioningofthelhcteststring2
AT schmidtr thecommissioningofthelhcteststring2
AT seriol thecommissioningofthelhcteststring2
AT bordryfrederick commissioningofthelhcteststring2
AT bozzinid commissioningofthelhcteststring2
AT casascubillosj commissioningofthelhcteststring2
AT cruikshankp commissioningofthelhcteststring2
AT dahleruppetersenk commissioningofthelhcteststring2
AT denzr commissioningofthelhcteststring2
AT herzogr commissioningofthelhcteststring2
AT pucciob commissioningofthelhcteststring2
AT rodriguezmateosf commissioningofthelhcteststring2
AT sabanri commissioningofthelhcteststring2
AT schmidtr commissioningofthelhcteststring2
AT seriol commissioningofthelhcteststring2