Status and Challenges of the LHC Construction

The LHC is designed to provide proton beams of 7 TeV and nominal luminosity of 10**34 cm**-2s**-1. This objective is achieved at an affordable cost by pushing all major collider components to the limits of technology, by upgrading the existing CERN accelerators and infrastructure, and by involving t...

Descripción completa

Detalles Bibliográficos
Autor principal: Ostojic, R
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/514345
_version_ 1780897588429455360
author Ostojic, R
author_facet Ostojic, R
author_sort Ostojic, R
collection CERN
description The LHC is designed to provide proton beams of 7 TeV and nominal luminosity of 10**34 cm**-2s**-1. This objective is achieved at an affordable cost by pushing all major collider components to the limits of technology, by upgrading the existing CERN accelerators and infrastructure, and by involving the technical expertise, resources and dedication of accelerator laboratories world-wide. Following a decade of intensive R&D and technical validation of major collider systems, the LHC construction is now fully underway. Major industrial contracts have been awarded and are in execution for the procurement of the magnet, cryogenics and other systems. In this report, the status of the design and construction of the major LHC systems is presented.
id cern-514345
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2001
record_format invenio
spelling cern-5143452023-05-31T13:21:00Zhttp://cds.cern.ch/record/514345engOstojic, RStatus and Challenges of the LHC ConstructionAccelerators and Storage RingsThe LHC is designed to provide proton beams of 7 TeV and nominal luminosity of 10**34 cm**-2s**-1. This objective is achieved at an affordable cost by pushing all major collider components to the limits of technology, by upgrading the existing CERN accelerators and infrastructure, and by involving the technical expertise, resources and dedication of accelerator laboratories world-wide. Following a decade of intensive R&D and technical validation of major collider systems, the LHC construction is now fully underway. Major industrial contracts have been awarded and are in execution for the procurement of the magnet, cryogenics and other systems. In this report, the status of the design and construction of the major LHC systems is presented.LHC-Project-Report-483CERN-LHC-Project-Report-483oai:cds.cern.ch:5143452001-08-06
spellingShingle Accelerators and Storage Rings
Ostojic, R
Status and Challenges of the LHC Construction
title Status and Challenges of the LHC Construction
title_full Status and Challenges of the LHC Construction
title_fullStr Status and Challenges of the LHC Construction
title_full_unstemmed Status and Challenges of the LHC Construction
title_short Status and Challenges of the LHC Construction
title_sort status and challenges of the lhc construction
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/514345
work_keys_str_mv AT ostojicr statusandchallengesofthelhcconstruction