Cargando…

The REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFF

After a general discussion of ISOL-facilities in Europe we focus on the present status of the REX-ISOLDE facility at CERN and the Munich Accelerator for Fission Fragments MAFF. At REX-ISOLDE in 2001 radioactive beams of ISOLDE will be accelerated to (0.8-2.4) MeV/u. At the new Munich high-flux react...

Descripción completa

Detalles Bibliográficos
Autores principales: Habs, D, Ames, F, Assmann, R W, Emhofer, S, Engels, O, Gross, M, Kester, O, Maier, H J, Reiter, P, Sieber, T, Thirolf, P G
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:https://dx.doi.org/10.1016/S0146-6410(01)00141-7
http://cds.cern.ch/record/516321
Descripción
Sumario:After a general discussion of ISOL-facilities in Europe we focus on the present status of the REX-ISOLDE facility at CERN and the Munich Accelerator for Fission Fragments MAFF. At REX-ISOLDE in 2001 radioactive beams of ISOLDE will be accelerated to (0.8-2.4) MeV/u. At the new Munich high-flux reactor FRM-II a production target of MAFF with 10$^{14}$ fissions/s is under design. Probably in 2003 intense low-energy beams ( approximately=10$^{11}$/s) of very neutron-rich fission fragments will be available. For MAFF a linac is being developed, which will accelerate the ions after charge breeding to energies between 3.7 and 5.9 MeV/u. In the long term a recycling ring with large momentum acceptance will further increase the radioactive beam intensities by a factor of 10$^{2}$-10$^{3}$ for specific experiments. (33 refs).