Cargando…
The REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFF
After a general discussion of ISOL-facilities in Europe we focus on the present status of the REX-ISOLDE facility at CERN and the Munich Accelerator for Fission Fragments MAFF. At REX-ISOLDE in 2001 radioactive beams of ISOLDE will be accelerated to (0.8-2.4) MeV/u. At the new Munich high-flux react...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/S0146-6410(01)00141-7 http://cds.cern.ch/record/516321 |
_version_ | 1780897647963406336 |
---|---|
author | Habs, D Ames, F Assmann, R W Emhofer, S Engels, O Gross, M Kester, O Maier, H J Reiter, P Sieber, T Thirolf, P G |
author_facet | Habs, D Ames, F Assmann, R W Emhofer, S Engels, O Gross, M Kester, O Maier, H J Reiter, P Sieber, T Thirolf, P G |
author_sort | Habs, D |
collection | CERN |
description | After a general discussion of ISOL-facilities in Europe we focus on the present status of the REX-ISOLDE facility at CERN and the Munich Accelerator for Fission Fragments MAFF. At REX-ISOLDE in 2001 radioactive beams of ISOLDE will be accelerated to (0.8-2.4) MeV/u. At the new Munich high-flux reactor FRM-II a production target of MAFF with 10$^{14}$ fissions/s is under design. Probably in 2003 intense low-energy beams ( approximately=10$^{11}$/s) of very neutron-rich fission fragments will be available. For MAFF a linac is being developed, which will accelerate the ions after charge breeding to energies between 3.7 and 5.9 MeV/u. In the long term a recycling ring with large momentum acceptance will further increase the radioactive beam intensities by a factor of 10$^{2}$-10$^{3}$ for specific experiments. (33 refs). |
id | cern-516321 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2001 |
record_format | invenio |
spelling | cern-5163212019-09-30T06:29:59Zdoi:10.1016/S0146-6410(01)00141-7http://cds.cern.ch/record/516321engHabs, DAmes, FAssmann, R WEmhofer, SEngels, OGross, MKester, OMaier, H JReiter, PSieber, TThirolf, P GThe REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFFDetectors and Experimental TechniquesAfter a general discussion of ISOL-facilities in Europe we focus on the present status of the REX-ISOLDE facility at CERN and the Munich Accelerator for Fission Fragments MAFF. At REX-ISOLDE in 2001 radioactive beams of ISOLDE will be accelerated to (0.8-2.4) MeV/u. At the new Munich high-flux reactor FRM-II a production target of MAFF with 10$^{14}$ fissions/s is under design. Probably in 2003 intense low-energy beams ( approximately=10$^{11}$/s) of very neutron-rich fission fragments will be available. For MAFF a linac is being developed, which will accelerate the ions after charge breeding to energies between 3.7 and 5.9 MeV/u. In the long term a recycling ring with large momentum acceptance will further increase the radioactive beam intensities by a factor of 10$^{2}$-10$^{3}$ for specific experiments. (33 refs).oai:cds.cern.ch:5163212001 |
spellingShingle | Detectors and Experimental Techniques Habs, D Ames, F Assmann, R W Emhofer, S Engels, O Gross, M Kester, O Maier, H J Reiter, P Sieber, T Thirolf, P G The REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFF |
title | The REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFF |
title_full | The REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFF |
title_fullStr | The REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFF |
title_full_unstemmed | The REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFF |
title_short | The REX-ISOLDE-project and the Munich Accelerator for Fission Fragments MAFF |
title_sort | rex-isolde-project and the munich accelerator for fission fragments maff |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1016/S0146-6410(01)00141-7 http://cds.cern.ch/record/516321 |
work_keys_str_mv | AT habsd therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT amesf therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT assmannrw therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT emhofers therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT engelso therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT grossm therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT kestero therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT maierhj therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT reiterp therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT siebert therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT thirolfpg therexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT habsd rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT amesf rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT assmannrw rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT emhofers rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT engelso rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT grossm rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT kestero rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT maierhj rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT reiterp rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT siebert rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff AT thirolfpg rexisoldeprojectandthemunichacceleratorforfissionfragmentsmaff |