Cargando…

Conclusions on 8 Years Operation of the LEP 4.5 K Refrigeration System at CERN

After 11 years of operation the Large Electron/Positron collider (LEP) was stopped in November 2000. Since 1993 a cryogenic system has been used to supply up to 72 superconducting (SC) cavity modules, using four large liquid-helium refrigerators at 4.5 K. We review eight years of operation of one of...

Descripción completa

Detalles Bibliográficos
Autores principales: Bangert, N, Claudet, S, Gayet, P, Sanmartí, M
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.1472027
http://cds.cern.ch/record/525103

Ejemplares similares