Cargando…
Conclusions from 12 Years Operational Experience of the Cryoplants for the Superconducting Magnets of the LEP Experiments
The Large Electron Positron Collider (LEP) has ended its last physics run in November 2000, and it is at present being dismantled to liberate the tunnel for the Large Hadron Collider (LHC) project to be completed by end of 2005. The cryogenic systems for the superconducting solenoid and focusing qua...
Autores principales: | Barth, K, Dauvergne, J P, Delikaris, D, Passardi, Giorgio |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1063/1.1472028 http://cds.cern.ch/record/526688 |
Ejemplares similares
-
Long term experience with cryoplant operation for superconducting magnets and rf cavities at CERN
por: Delikaris, D, et al.
Publicado: (1993) -
LEP1 cryoplants (PA4/PA8)
por: Barth, K, et al.
Publicado: (2000) -
Technical Analysis and Statistics from Long Term Helium Cryoplant Operation with Experimental Superconducting Magnets at CERN
por: Dauvergne, J P, et al.
Publicado: (1996) -
Application of liquid-helium cryoplants at CERN
por: Dauvergne, J P, et al.
Publicado: (1993) -
Operating modes of LEP 2 cryoplants
por: Güsewell, D
Publicado: (1993)