Cargando…
Front-End electronics configuration system for CMS
The four LHC experiments at CERN have decided to use a commercial SCADA (Supervisory Control And Data Acquisition) product for the supervision of their DCS (Detector Control System). The selected SCADA, which is therefore used for the CMS DCS, is PVSS II from the company ETM. This SCADA has its own...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/531399 |
Sumario: | The four LHC experiments at CERN have decided to use a commercial SCADA (Supervisory Control And Data Acquisition) product for the supervision of their DCS (Detector Control System). The selected SCADA, which is therefore used for the CMS DCS, is PVSS II from the company ETM. This SCADA has its own database, which is suitable for storing conventional controls data such as voltages, temperatures and pressures. In addition, calibration data and FE (Front-End) electronics configuration need to be stored. The amount of these data is too large to be stored in the SCADA database [1]. Therefore an external database will be used for managing such data. However, this database should be completely integrated into the SCADA framework, it should be accessible from the SCADA and the SCADA features, e.g. alarming, logging should be benefited from. For prototyping, Oracle 8i was selected as the external database manager. The development of the control system for calibration constants and FE electronics configuration has been done in close collaboration with the CMS tracker group and JCOP (Joint COntrols Project)(1). (1)The four LHC experiments and the CERN IT/CO group has merged their efforts to build the experiments controls systems and set up the JCOP at the end of December, 1997 for this purpose. |
---|