Cargando…
Timing, Trigger and Control Systems for LHC Detectors
\\ \\At the LHC, precise bunch-crossing clock and machine orbit signals must be broadcast over distances of several km from the Prevessin Control Room to the four experiment areas and other destinations. At the LHC experiments themselves, quite extensive distribution systems are also required for th...
Autor principal: | Toifl, T |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Acceso en línea: | http://cds.cern.ch/record/5450 |
Ejemplares similares
-
Status report on the RD12 project: timing, trigger and control systems for LHC detectors
por: Ashton, M, et al.
Publicado: (2000) -
Workshop on Timing, Trigger and Control Systems for LHC Detectors
Publicado: (1996) -
Optical timing, trigger and control distribution for LHC detectors
por: Taylor, B G
Publicado: (1993) -
Measurements of radiation effects on the timing, trigger and control receiver (TTCrx) ASIC
por: Toifl, Thomas H, et al.
Publicado: (2000) -
Status report on the RD-12 project: timing, trigger and control systems for LHC detectors
por: Villalobos Baillie, O, et al.
Publicado: (1997)