Cargando…

A Brief History of the LEP Collider

The Large Electron Positron collider LEP at CERN was commissioned in 1989 and finished operation in November 2000. During this period it was operated in different modes, with different optics, at different energies, and with varied performance. In the end, LEP surpassed all relevant design parameter...

Descripción completa

Detalles Bibliográficos
Autores principales: Assmann, R W, Lamont, M, Myers, S
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:https://dx.doi.org/10.1016/S0920-5632(02)90005-8
http://cds.cern.ch/record/549223
_version_ 1780898467623731200
author Assmann, R W
Lamont, M
Myers, S
author_facet Assmann, R W
Lamont, M
Myers, S
author_sort Assmann, R W
collection CERN
description The Large Electron Positron collider LEP at CERN was commissioned in 1989 and finished operation in November 2000. During this period it was operated in different modes, with different optics, at different energies, and with varied performance. In the end, LEP surpassed all relevant design parameters. It has provided a large amount of data for the precision study of the standard model, first on the Z 0 resonance, and then above the W+ pair threshold. Finally, with beam energies above 100 GeV, a tantalizing glimpse of what might have been the Higgs boson was observed. A brief history of the main modes of operation, associated performance, the highlights and the challenges met over the 12 years of running is presented.
id cern-549223
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-5492232023-05-05T13:08:14Zdoi:10.1016/S0920-5632(02)90005-8http://cds.cern.ch/record/549223engAssmann, R WLamont, MMyers, SA Brief History of the LEP ColliderAccelerators and Storage RingsThe Large Electron Positron collider LEP at CERN was commissioned in 1989 and finished operation in November 2000. During this period it was operated in different modes, with different optics, at different energies, and with varied performance. In the end, LEP surpassed all relevant design parameters. It has provided a large amount of data for the precision study of the standard model, first on the Z 0 resonance, and then above the W+ pair threshold. Finally, with beam energies above 100 GeV, a tantalizing glimpse of what might have been the Higgs boson was observed. A brief history of the main modes of operation, associated performance, the highlights and the challenges met over the 12 years of running is presented.CERN-SL-2002-009-OPoai:cds.cern.ch:5492232002-04-30
spellingShingle Accelerators and Storage Rings
Assmann, R W
Lamont, M
Myers, S
A Brief History of the LEP Collider
title A Brief History of the LEP Collider
title_full A Brief History of the LEP Collider
title_fullStr A Brief History of the LEP Collider
title_full_unstemmed A Brief History of the LEP Collider
title_short A Brief History of the LEP Collider
title_sort brief history of the lep collider
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1016/S0920-5632(02)90005-8
http://cds.cern.ch/record/549223
work_keys_str_mv AT assmannrw abriefhistoryofthelepcollider
AT lamontm abriefhistoryofthelepcollider
AT myerss abriefhistoryofthelepcollider
AT assmannrw briefhistoryofthelepcollider
AT lamontm briefhistoryofthelepcollider
AT myerss briefhistoryofthelepcollider