Cargando…
Upgrade Study of INR Proton Linac for Production of 3 MW Beam
Autores principales: | Kravchuk, L V, Ostroumov, P N |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/552631 |
Ejemplares similares
-
Commissioning of New Injection Line at INR Proton Linac
por: Esin, S K, et al.
Publicado: (1999) -
Operational Experience Of The First 20-mev Tank Of The Inr linac
por: Bylinsky, Yu V, et al.
Publicado: (1990) -
Upgrading the AGS to 1 MW Proton Beam Power
por: Roser, T, et al.
Publicado: (2001) -
DESY Linac-III Upgrade Study
por: Esin, S K, et al.
Publicado: (1996) -
Feasibility study of the reference JHF linac and a proposal for the upgrade of the linac
por: Bylinsky, Y V, et al.
Publicado: (1997)