Cargando…
Beam Commissioning of the PEP-II High Energy Ring
Autores principales: | Wienands, U, Assmann, R, Bharadwaj, V, Cai, Y, Corredoura, P., Donald, M, Fox, J, Fieguth, T, Fisher, A, Heifets, S, Hill, A, Himel, T, Iverson, R, Johnson, R, Judkins, J, Kozanecki, W, Kulikov, A, Lee, M, Mattison, T, Minty, M, Nosochkov, Y, Prabhakar, S, Safranek, J, Smith, S, Smith, V, Schwarz, H, Schultz, D, Seeman, J, Sullivan, M, Teytelman, D, Tighe, R, Trailer, R, Turner, J, Zimmermann, F, Barry, W, Corlett, J, Furman, M., Rimmer, R, Zholents, A, Lumpkin, A, Lomperski, M, Bialowons, W, Placidi, M, Zotter, B |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/552632 |
Ejemplares similares
-
The Electron Cloud Instability at PEP-II
por: Kulikov, A, et al.
Publicado: (2001) -
Beam-beam collisions at the PEP-II B factory
por: Sullivan, M, et al.
Publicado: (1999) -
Operational Experience with the PEP-II Transverse Coupled-Bunch Feedback Systems
por: Barry, W, et al.
Publicado: (1999) -
Commissioning the beam diagnostics for the PEP-II B factory
por: Fisher, A S, et al.
Publicado: (1998) -
The Next Linear Collider Damping Ring RF System
por: Corlett, J N, et al.
Publicado: (1999)