Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001
In the framework of the CLIC studies, we report on the first commissioning period of the CTF3 Preliminary Phase. Extensive tests were carried out on the front-end and the linac in order to measure the beam properties (energy, emittance, Twiss parameters and bunch length). In the injection line, disp...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/552835 |
_version_ | 1780898561195507712 |
---|---|
author | Corsini, R Dupuy, B Rinolfi, Louis Royer, P Tecker, F A Ferrari, A |
author_facet | Corsini, R Dupuy, B Rinolfi, Louis Royer, P Tecker, F A Ferrari, A |
author_sort | Corsini, R |
collection | CERN |
description | In the framework of the CLIC studies, we report on the first commissioning period of the CTF3 Preliminary Phase. Extensive tests were carried out on the front-end and the linac in order to measure the beam properties (energy, emittance, Twiss parameters and bunch length). In the injection line, dispersion measurements were performed and showed a good agreement with the simulations. The beam was also successfully injected and accumulated in the ring, allowing preliminary measurements of the optics in two different operation modes. In this paper, we give a summary of the results which were obtained in 2001. |
id | cern-552835 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2002 |
record_format | invenio |
spelling | cern-5528352023-08-17T09:45:07Zhttp://cds.cern.ch/record/552835engCorsini, RDupuy, BRinolfi, LouisRoyer, PTecker, F AFerrari, ACommissioning of the CLIC Test Facility 3: Preliminary Phase in 2001Accelerators and Storage RingsIn the framework of the CLIC studies, we report on the first commissioning period of the CTF3 Preliminary Phase. Extensive tests were carried out on the front-end and the linac in order to measure the beam properties (energy, emittance, Twiss parameters and bunch length). In the injection line, dispersion measurements were performed and showed a good agreement with the simulations. The beam was also successfully injected and accumulated in the ring, allowing preliminary measurements of the optics in two different operation modes. In this paper, we give a summary of the results which were obtained in 2001.CERN-PS-2002-005-AECLIC-Note-507oai:cds.cern.ch:5528352002-05-22 |
spellingShingle | Accelerators and Storage Rings Corsini, R Dupuy, B Rinolfi, Louis Royer, P Tecker, F A Ferrari, A Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001 |
title | Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001 |
title_full | Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001 |
title_fullStr | Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001 |
title_full_unstemmed | Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001 |
title_short | Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001 |
title_sort | commissioning of the clic test facility 3: preliminary phase in 2001 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/552835 |
work_keys_str_mv | AT corsinir commissioningoftheclictestfacility3preliminaryphasein2001 AT dupuyb commissioningoftheclictestfacility3preliminaryphasein2001 AT rinolfilouis commissioningoftheclictestfacility3preliminaryphasein2001 AT royerp commissioningoftheclictestfacility3preliminaryphasein2001 AT teckerfa commissioningoftheclictestfacility3preliminaryphasein2001 AT ferraria commissioningoftheclictestfacility3preliminaryphasein2001 |