Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001

In the framework of the CLIC studies, we report on the first commissioning period of the CTF3 Preliminary Phase. Extensive tests were carried out on the front-end and the linac in order to measure the beam properties (energy, emittance, Twiss parameters and bunch length). In the injection line, disp...

Descripción completa

Detalles Bibliográficos
Autores principales: Corsini, R, Dupuy, B, Rinolfi, Louis, Royer, P, Tecker, F A, Ferrari, A
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/552835
_version_ 1780898561195507712
author Corsini, R
Dupuy, B
Rinolfi, Louis
Royer, P
Tecker, F A
Ferrari, A
author_facet Corsini, R
Dupuy, B
Rinolfi, Louis
Royer, P
Tecker, F A
Ferrari, A
author_sort Corsini, R
collection CERN
description In the framework of the CLIC studies, we report on the first commissioning period of the CTF3 Preliminary Phase. Extensive tests were carried out on the front-end and the linac in order to measure the beam properties (energy, emittance, Twiss parameters and bunch length). In the injection line, dispersion measurements were performed and showed a good agreement with the simulations. The beam was also successfully injected and accumulated in the ring, allowing preliminary measurements of the optics in two different operation modes. In this paper, we give a summary of the results which were obtained in 2001.
id cern-552835
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-5528352023-08-17T09:45:07Zhttp://cds.cern.ch/record/552835engCorsini, RDupuy, BRinolfi, LouisRoyer, PTecker, F AFerrari, ACommissioning of the CLIC Test Facility 3: Preliminary Phase in 2001Accelerators and Storage RingsIn the framework of the CLIC studies, we report on the first commissioning period of the CTF3 Preliminary Phase. Extensive tests were carried out on the front-end and the linac in order to measure the beam properties (energy, emittance, Twiss parameters and bunch length). In the injection line, dispersion measurements were performed and showed a good agreement with the simulations. The beam was also successfully injected and accumulated in the ring, allowing preliminary measurements of the optics in two different operation modes. In this paper, we give a summary of the results which were obtained in 2001.CERN-PS-2002-005-AECLIC-Note-507oai:cds.cern.ch:5528352002-05-22
spellingShingle Accelerators and Storage Rings
Corsini, R
Dupuy, B
Rinolfi, Louis
Royer, P
Tecker, F A
Ferrari, A
Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001
title Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001
title_full Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001
title_fullStr Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001
title_full_unstemmed Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001
title_short Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001
title_sort commissioning of the clic test facility 3: preliminary phase in 2001
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/552835
work_keys_str_mv AT corsinir commissioningoftheclictestfacility3preliminaryphasein2001
AT dupuyb commissioningoftheclictestfacility3preliminaryphasein2001
AT rinolfilouis commissioningoftheclictestfacility3preliminaryphasein2001
AT royerp commissioningoftheclictestfacility3preliminaryphasein2001
AT teckerfa commissioningoftheclictestfacility3preliminaryphasein2001
AT ferraria commissioningoftheclictestfacility3preliminaryphasein2001