Cargando…
Commissioning Run of the Long-Baseline Neutrino Oscillation Experiment at the 12-GeV KEK-PS
Autor principal: | Sato, H |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/553808 |
Ejemplares similares
-
Injection error monitor for KEK 12 GeV PS
por: Shirakata, M, et al.
Publicado: (1993) -
Neutron beam line at the KEK 12-GeV PS
por: Noumi, H, et al.
Publicado: (1995) -
Run 407, 17.12.1973, 26 geV, 20 bunches: Longitudinal bunch oscillations during the run with the PS booster
por: Hofmann, A, et al.
Publicado: (1974) -
Repetitive Voltage Control Of The Main Ring Magnet Power supply For The kek 12-gev Ps
por: Sueno, T, et al.
Publicado: (1990) -
Orbit control and ABS trial at KEK 12 GeV proton synchrotron main ring
por: Nakagawa, H, et al.
Publicado: (1999)