Cargando…
The Present Status of the JAERI/KEK Joint Project for High-Intensity Proton Accelerators
Autor principal: | Yamazaki, Y |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/554716 |
Ejemplares similares
-
Accelerator Complex for the Joint Project of KEK/JHF and JAERI/NSP
por: Yamazaki, Y, et al.
Publicado: (1999) -
Synchrotron RF System for JAERI-KEK Joint Project
por: Ohmori, C, et al.
Publicado: (2001) -
Study for an ep Instability in the Joint Project of KEK and JAERI
por: Toyama, T, et al.
Publicado: (2002) -
Longitudinal Emittance Control and Beam Loading Effects on Proton Synchrotrons in JAERI-KEK Joint Project
por: Yamamoto, M, et al.
Publicado: (2001) -
Beam Collimator Design for the 3GeV Synchrotron of the JAERI-KEK Joint Project
por: Yamamoto, K, et al.
Publicado: (2001)