Cargando…
The Coupling Correction System at RHIC: Results for the Run 2000 and Plans for 2001
Autores principales: | Pilat, F, Fischer, W, Peggs, S, Ptitsyn, V I, Tepikian, S |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/556373 |
Ejemplares similares
-
Processing and Analysis of the Measured Alignment Errors for RHIC
por: Pilat, F, et al.
Publicado: (1999) -
Simultaneous Tune and Coupling Feedback during RHIC Run 6
por: Cameron, P, et al.
Publicado: (2006) -
Overview of Beam Studies at RHIC during the Year 2000 Run
por: Pilat, F, et al.
Publicado: (2001) -
Linear and Nonlinear Corrections in the RHIC Interaction Regions
por: Pilat, F, et al.
Publicado: (2002) -
Measurement and Correction of Linear Effects in the RHIC Interaction Regions
por: Ptitsyn, V I, et al.
Publicado: (2001)