Cargando…
Beam Coupling Phenomena in Fast Kicker Systems
Autores principales: | Zhang, W, Ahrens, L A, Glenn, J W, Sandberg, J, Tsoupas, N |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/556622 |
Ejemplares similares
-
Beam Parameters of the AGS Synchrotron during Fast Beam Extraction at the Location of the AGS Kicker
por: Tsoupas, N, et al.
Publicado: (2001) -
The RHIC Beam Abort Kicker System
por: Hahn, H, et al.
Publicado: (1999) -
Beam Coupling Impedance of Fast Stripline Beam Kickers
por: Poole, B R, et al.
Publicado: (1999) -
A New Conceptual Design of the SNS Full Turn Fast Extraction Kicker Power Supply System
por: Zhang, W, et al.
Publicado: (2001) -
RHIC Beam Abort Kicker Power Supply System Commissioning Experience and Remaining Issues
por: Zhang, W, et al.
Publicado: (2001)