Cargando…
Beam Commissioning and First Operation of the ISAC DTL at TRIUMF
Autores principales: | Laxdal, R E, Dutto, G, Fong, K, MacKenzie, G H, Pasini, M, Poirier, R L, Ruegg, R |
---|---|
Lenguaje: | eng |
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/556688 |
Ejemplares similares
-
ISAC: radioactive ion beams facility at TRIUMF
por: Bricault, P G, et al.
Publicado: (1996) -
RF Measurement Summary of ISAC DTL Tanks and DTL Bunchers
por: Mitra, A K, et al.
Publicado: (2001) -
Commissioning of the TRIUMF ISAC RF System
por: Fong, K, et al.
Publicado: (2001) -
Progress in the Conceptual Design of the ISAC-II Linac at TRIUMF
por: Laxdal, R E, et al.
Publicado: (2001) -
Beam Dynamics Design of the TRIUMF ISAC RFQ
por: Koscielniak, Shane Rupert, et al.
Publicado: (1996)