Cargando…

LEIR: The low energy ion ring at CERN

Amongst all the modifications of the PS Complex to produce the LHC ion beams, the conversion of the old Low Energy Antiproton Ring (LEAR) into the Low Energy Ion Ring (LEIR) is a major issue. The accumulation in LEIR of 9*108 Lead ions in normalized transverse emittances of 0.7 mm allows the product...

Descripción completa

Detalles Bibliográficos
Autor principal: Chanel, M
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/557588
_version_ 1780899010437971968
author Chanel, M
author_facet Chanel, M
author_sort Chanel, M
collection CERN
description Amongst all the modifications of the PS Complex to produce the LHC ion beams, the conversion of the old Low Energy Antiproton Ring (LEAR) into the Low Energy Ion Ring (LEIR) is a major issue. The accumulation in LEIR of 9*108 Lead ions in normalized transverse emittances of 0.7 mm allows the production of 4 of the 592 bunches needed in one LHC ring, in one LEIR cycle. Then, it will take around 10 min to fill one LHC ring. The requested luminosity of 1027 cm-2s-1 for lead ion collisions is reachable and is ~1000 times more that the actual chain (Linac3, PSB) can do. The production of Lead ion beams is described, with particular attention to electron cooling, the injection system and the beam lifetime.
id cern-557588
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-5575882022-08-17T13:34:48Zhttp://cds.cern.ch/record/557588engChanel, MLEIR: The low energy ion ring at CERNAccelerators and Storage RingsAmongst all the modifications of the PS Complex to produce the LHC ion beams, the conversion of the old Low Energy Antiproton Ring (LEAR) into the Low Energy Ion Ring (LEIR) is a major issue. The accumulation in LEIR of 9*108 Lead ions in normalized transverse emittances of 0.7 mm allows the production of 4 of the 592 bunches needed in one LHC ring, in one LEIR cycle. Then, it will take around 10 min to fill one LHC ring. The requested luminosity of 1027 cm-2s-1 for lead ion collisions is reachable and is ~1000 times more that the actual chain (Linac3, PSB) can do. The production of Lead ion beams is described, with particular attention to electron cooling, the injection system and the beam lifetime.CERN-PS-2002-015-AECERN-AB-2003-086-ABPoai:cds.cern.ch:5575882002-06-05
spellingShingle Accelerators and Storage Rings
Chanel, M
LEIR: The low energy ion ring at CERN
title LEIR: The low energy ion ring at CERN
title_full LEIR: The low energy ion ring at CERN
title_fullStr LEIR: The low energy ion ring at CERN
title_full_unstemmed LEIR: The low energy ion ring at CERN
title_short LEIR: The low energy ion ring at CERN
title_sort leir: the low energy ion ring at cern
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/557588
work_keys_str_mv AT chanelm leirthelowenergyionringatcern