Cargando…
The LEP RF Trip and Beam Loss Diagnostics System
During the last years of operation the number of operationally independent RF stations distributed around LEP reached a total of 40. A serious difficulty when running at high energy and high beam intensities was to establish cause and effect in beam loss situations, where the trip of any single RF s...
Autores principales: | Arnaudon, L, Butterworth, A, Beetham, G, Ciapala, Edmond, Juillard, J C, Olsen, R |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/560923 |
Ejemplares similares
-
RF Trip and Beam Loss Diagnostics in LEP using GPS timing
por: Arnaudon, L, et al.
Publicado: (2000) -
Control of total voltage in the large distributed RF system of LEP
por: Ciapala, Edmond, et al.
Publicado: (1995) -
Use of VME CPU modules for performance upgrade of G64 equipment controllers for the LEP RF system
por: Arnaudon, L, et al.
Publicado: (1994) -
Global voltage control for the LEP RF system
por: Ciapala, Edmond, et al.
Publicado: (1993) -
Front-end computing in the LEP2 RF system
por: Arnaudon, L, et al.
Publicado: (1997)