Status of the CTF3 commissioning
The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of the electron bunch train combination process on which the CLIC drive beam generation scheme is based. The principle of the combination relies on the injection of short electron bunches into an isochron...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/565618 |
_version_ | 1780899152071229440 |
---|---|
author | Corsini, R Dupuy, B Rinolfi, Louis Royer, P Tecker, F A Ferrari, A |
author_facet | Corsini, R Dupuy, B Rinolfi, Louis Royer, P Tecker, F A Ferrari, A |
author_sort | Corsini, R |
collection | CERN |
description | The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of the electron bunch train combination process on which the CLIC drive beam generation scheme is based. The principle of the combination relies on the injection of short electron bunches into an isochronous ring using RF deflecting cavities. The commissioning of this facility started in September 2001, with alternating periods of installation work and beam studies. In this paper, we present the status of the facility, the first beam measurements and the next steps towards the completion of the experiment. |
id | cern-565618 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2002 |
record_format | invenio |
spelling | cern-5656182023-08-17T09:45:12Zhttp://cds.cern.ch/record/565618engCorsini, RDupuy, BRinolfi, LouisRoyer, PTecker, F AFerrari, AStatus of the CTF3 commissioningAccelerators and Storage RingsThe Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of the electron bunch train combination process on which the CLIC drive beam generation scheme is based. The principle of the combination relies on the injection of short electron bunches into an isochronous ring using RF deflecting cavities. The commissioning of this facility started in September 2001, with alternating periods of installation work and beam studies. In this paper, we present the status of the facility, the first beam measurements and the next steps towards the completion of the experiment.CERN-PS-2002-039-AECLIC-Note-522oai:cds.cern.ch:5656182002-07-01 |
spellingShingle | Accelerators and Storage Rings Corsini, R Dupuy, B Rinolfi, Louis Royer, P Tecker, F A Ferrari, A Status of the CTF3 commissioning |
title | Status of the CTF3 commissioning |
title_full | Status of the CTF3 commissioning |
title_fullStr | Status of the CTF3 commissioning |
title_full_unstemmed | Status of the CTF3 commissioning |
title_short | Status of the CTF3 commissioning |
title_sort | status of the ctf3 commissioning |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/565618 |
work_keys_str_mv | AT corsinir statusofthectf3commissioning AT dupuyb statusofthectf3commissioning AT rinolfilouis statusofthectf3commissioning AT royerp statusofthectf3commissioning AT teckerfa statusofthectf3commissioning AT ferraria statusofthectf3commissioning |