Status of the CTF3 commissioning

The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of the electron bunch train combination process on which the CLIC drive beam generation scheme is based. The principle of the combination relies on the injection of short electron bunches into an isochron...

Descripción completa

Detalles Bibliográficos
Autores principales: Corsini, R, Dupuy, B, Rinolfi, Louis, Royer, P, Tecker, F A, Ferrari, A
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/565618
_version_ 1780899152071229440
author Corsini, R
Dupuy, B
Rinolfi, Louis
Royer, P
Tecker, F A
Ferrari, A
author_facet Corsini, R
Dupuy, B
Rinolfi, Louis
Royer, P
Tecker, F A
Ferrari, A
author_sort Corsini, R
collection CERN
description The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of the electron bunch train combination process on which the CLIC drive beam generation scheme is based. The principle of the combination relies on the injection of short electron bunches into an isochronous ring using RF deflecting cavities. The commissioning of this facility started in September 2001, with alternating periods of installation work and beam studies. In this paper, we present the status of the facility, the first beam measurements and the next steps towards the completion of the experiment.
id cern-565618
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-5656182023-08-17T09:45:12Zhttp://cds.cern.ch/record/565618engCorsini, RDupuy, BRinolfi, LouisRoyer, PTecker, F AFerrari, AStatus of the CTF3 commissioningAccelerators and Storage RingsThe Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of the electron bunch train combination process on which the CLIC drive beam generation scheme is based. The principle of the combination relies on the injection of short electron bunches into an isochronous ring using RF deflecting cavities. The commissioning of this facility started in September 2001, with alternating periods of installation work and beam studies. In this paper, we present the status of the facility, the first beam measurements and the next steps towards the completion of the experiment.CERN-PS-2002-039-AECLIC-Note-522oai:cds.cern.ch:5656182002-07-01
spellingShingle Accelerators and Storage Rings
Corsini, R
Dupuy, B
Rinolfi, Louis
Royer, P
Tecker, F A
Ferrari, A
Status of the CTF3 commissioning
title Status of the CTF3 commissioning
title_full Status of the CTF3 commissioning
title_fullStr Status of the CTF3 commissioning
title_full_unstemmed Status of the CTF3 commissioning
title_short Status of the CTF3 commissioning
title_sort status of the ctf3 commissioning
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/565618
work_keys_str_mv AT corsinir statusofthectf3commissioning
AT dupuyb statusofthectf3commissioning
AT rinolfilouis statusofthectf3commissioning
AT royerp statusofthectf3commissioning
AT teckerfa statusofthectf3commissioning
AT ferraria statusofthectf3commissioning