Status of the CTF3 commissioning
The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of the electron bunch train combination process on which the CLIC drive beam generation scheme is based. The principle of the combination relies on the injection of short electron bunches into an isochron...
Autores principales: | Corsini, R, Dupuy, B, Rinolfi, Louis, Royer, P, Tecker, F A, Ferrari, A |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/565618 |
Ejemplares similares
-
Status of the CTF3 commissioning
por: Corsini, R, et al.
Publicado: (2002) -
Commissioning of a Bunch Frequency Monitor for the CTF3 Preliminary Phase
por: Ferrari, A, et al.
Publicado: (2003) -
Status of CTF3 at the End of 2004, Beam Commissioning Results and Plans for the Future
por: Corsini, R, et al.
Publicado: (2005) -
Commissioning of the CLIC Test Facility 3: Preliminary Phase in 2001
por: Corsini, R, et al.
Publicado: (2002) -
Beam Dynamics for the CTF3 Preliminary Phase
por: Corsini, R, et al.
Publicado: (2001)