Cargando…

Orchestrating the measurements on twelve magnet test benches

The final LHC dipole series test set-up will consist of 12 benches, organised in 6 clusters of two benches sharing the largest and most expensive devices. This sharing is made possible by a deliberate de-phasing of the tests among magnets, ensuring an optimum use of resources, such as cryogenics and...

Descripción completa

Detalles Bibliográficos
Autores principales: Rijllart, A, Coutinho-Ferreira, P M, Gorskaya, E A, Raimondo, A, Reymond, H
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/566853
_version_ 1780899176999026688
author Rijllart, A
Coutinho-Ferreira, P M
Gorskaya, E A
Raimondo, A
Reymond, H
author_facet Rijllart, A
Coutinho-Ferreira, P M
Gorskaya, E A
Raimondo, A
Reymond, H
author_sort Rijllart, A
collection CERN
description The final LHC dipole series test set-up will consist of 12 benches, organised in 6 clusters of two benches sharing the largest and most expensive devices. This sharing is made possible by a deliberate de-phasing of the tests among magnets, ensuring an optimum use of resources, such as cryogenics and power equipment, without limiting the total throughput. To orchestrate the measurements a Test Master is needed to organise the tests per cluster and a Resource Manager to centralise the booking of the resources.
id cern-566853
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-5668532023-05-31T13:21:08Zhttp://cds.cern.ch/record/566853engRijllart, ACoutinho-Ferreira, P MGorskaya, E ARaimondo, AReymond, HOrchestrating the measurements on twelve magnet test benchesAccelerators and Storage RingsThe final LHC dipole series test set-up will consist of 12 benches, organised in 6 clusters of two benches sharing the largest and most expensive devices. This sharing is made possible by a deliberate de-phasing of the tests among magnets, ensuring an optimum use of resources, such as cryogenics and power equipment, without limiting the total throughput. To orchestrate the measurements a Test Master is needed to organise the tests per cluster and a Resource Manager to centralise the booking of the resources.LHC-Project-Report-575CERN-LHC-Project-Report-575oai:cds.cern.ch:5668532002-07-02
spellingShingle Accelerators and Storage Rings
Rijllart, A
Coutinho-Ferreira, P M
Gorskaya, E A
Raimondo, A
Reymond, H
Orchestrating the measurements on twelve magnet test benches
title Orchestrating the measurements on twelve magnet test benches
title_full Orchestrating the measurements on twelve magnet test benches
title_fullStr Orchestrating the measurements on twelve magnet test benches
title_full_unstemmed Orchestrating the measurements on twelve magnet test benches
title_short Orchestrating the measurements on twelve magnet test benches
title_sort orchestrating the measurements on twelve magnet test benches
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/566853
work_keys_str_mv AT rijllarta orchestratingthemeasurementsontwelvemagnettestbenches
AT coutinhoferreirapm orchestratingthemeasurementsontwelvemagnettestbenches
AT gorskayaea orchestratingthemeasurementsontwelvemagnettestbenches
AT raimondoa orchestratingthemeasurementsontwelvemagnettestbenches
AT reymondh orchestratingthemeasurementsontwelvemagnettestbenches