Cargando…
Engineering data management through different breakdown structures in a large-scale project
This document discusses the benefits stemming from managing different project breakdown structures with an engineering data management system. The structures discussed are project breakdown structure (PBS), assembly breakdown structure (ABS), as-built structure and hardware breakdown. Each structure...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/S0263-7863(01)00029-1 http://cds.cern.ch/record/567319 |