Cargando…
Engineering data management through different breakdown structures in a large-scale project
This document discusses the benefits stemming from managing different project breakdown structures with an engineering data management system. The structures discussed are project breakdown structure (PBS), assembly breakdown structure (ABS), as-built structure and hardware breakdown. Each structure...
Autores principales: | Hameri, A P, Nitter, P |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/S0263-7863(01)00029-1 http://cds.cern.ch/record/567319 |
Ejemplares similares
-
Document management guidelines for distributed project networks
por: Hameri, A P, et al.
Publicado: (1999) -
Work Breakdown Structures: The Foundation for Project Management Excellence
por: Norman, Eric S, et al.
Publicado: (2011) -
Planning and scheduling for distributed, one-off and complex system projects
por: Kotamaki, M, et al.
Publicado: (1998) -
Product data management: exploratory study on state-of-the-art in one-of-a-kind industry
por: Hameri, A P, et al.
Publicado: (1998) -
Towards the Extended Enterprise in Project Business
por: Hameri, A P, et al.
Publicado: (2000)