Cargando…
Two years of AD operation: Experience and progress
The antiproton decelerator (AD) has been running successfully for physics for the past two years. After the end of the commissioning period [1] that finished in 2000, the machine has gradually been improved. The main efforts were concentrated on increasing the beam intensity, reducing the cycle leng...
Autores principales: | Belochitskii, P, Eriksson, T, Findlay, A, Holzer, E B, MacCaferri, R, Maury, S, Pasinelli, S, Pedersen, F, Tranquille, G |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/567353 |
Ejemplares similares
-
Two years of AD operation: experience and progress
por: Belochitskii, P, et al.
Publicado: (2002) -
Commissioning and First Operation of the Antiproton Decelerator (AD)
por: Belochitskii, P, et al.
Publicado: (2001) -
Commissioning and first operation of the Antiproton Decelerator (AD)
por: Belochitskii, P, et al.
Publicado: (2001) -
A versatile local control system for the LEIR/AD electron cooler
por: MacCaferri, R, et al.
Publicado: (1999) -
The CERN antiproton decelerator (AD) in 2002: status, progress and machine development results
por: Belochitskii, P, et al.
Publicado: (2004)