Cargando…
Future plans at ISOLDE
The CERN ISOLDE facility has operated for over 30 years delivering beams of exotic ions to an ever-growing user community. The facility went through a major up-grade in the early 1990s with the move from the 600 MeV synchrocyclotron to the 1 GeV PS-Booster proton synchrotron. This was followed by a...
Autor principal: | Lindroos, M |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/S0168-583X(03)00494-4 http://cds.cern.ch/record/568197 |
Ejemplares similares
-
Future plans at ISOLDE
por: Lindroos, M.
Publicado: (2002) -
Automatic steering: an option for ISOLDE?
por: Lindroos, M
Publicado: (1999) -
HIE-ISOLDE
por: Lindroos, M, et al.
Publicado: (2008) -
Staggered extraction of the four BOOSTER rings for ISOLDE: Beam test results and future perspectives
por: Cyvoct, G, et al.
Publicado: (1995) -
HIE-ISOLDE: the technical options
por: Lindroos, Mats, et al.
Publicado: (2006)