Cargando…
Upgrade of the SPS extraction Kickers for LHC and CNGS Operation
The extraction kickers of the Super Proton Synchrotron (SPS) need to be upgraded to meet the Large Hadron Collider (LHC) and CERN Neutrino to Grand Sasso (CNGS) requirements. Commissioning of the extraction towards one of the LHC rings and the CNGS facility under construction is foreseen for 2003. T...
Autores principales: | Gaxiola, E H R, Uythoven, J, Timmins, M |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/569467 |
Ejemplares similares
-
Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS
por: Gaxiola, E, et al.
Publicado: (2004) -
Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS
por: Humberto Gaxiola, Enrique, et al.
Publicado: (2004) -
SPS extraction kicker magnet cooling design
por: Timmins, M, et al.
Publicado: (2006) -
The New SPS Extraction Channel for LHC and CNGS
por: Goddard, B, et al.
Publicado: (2000) -
Upgrading of the SPS injection kicker system for LHC requirements
por: Ducimetière, L, et al.
Publicado: (1998)