CTF3 Drive Beam Accelerating Structures

The 3 GHz drive beam accelerator of the CLIC Test Facility CTF3, currently under construction at CERN, will be equipped with 16 novel SICA (Slotted Iris – Constant Aperture) accelerating structures. The slotted irises couple out the potentially disruptive induced transverse HOM energy to i...

Descripción completa

Detalles Bibliográficos
Autor principal: Jensen, E
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/581340
_version_ 1780899458672754688
author Jensen, E
author_facet Jensen, E
author_sort Jensen, E
collection CERN
description The 3 GHz drive beam accelerator of the CLIC Test Facility CTF3, currently under construction at CERN, will be equipped with 16 novel SICA (Slotted Iris – Constant Aperture) accelerating structures. The slotted irises couple out the potentially disruptive induced transverse HOM energy to integrated silicon carbide loads (dipole mode Q's below 20). The use of nose cones for detuning allows a constant inner aperture (34 mm). The structures will be 1.2 m long and consist of 34 cells. A first 6 cell prototype structure has been tested successfully up to power levels of 100 MW (nominal: 30 MW), corresponding to surface electric field levels of 180 MV/m.
id cern-581340
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-5813402023-08-17T09:45:15Zhttp://cds.cern.ch/record/581340engJensen, ECTF3 Drive Beam Accelerating StructuresAccelerators and Storage RingsThe 3 GHz drive beam accelerator of the CLIC Test Facility CTF3, currently under construction at CERN, will be equipped with 16 novel SICA (Slotted Iris – Constant Aperture) accelerating structures. The slotted irises couple out the potentially disruptive induced transverse HOM energy to integrated silicon carbide loads (dipole mode Q's below 20). The use of nose cones for detuning allows a constant inner aperture (34 mm). The structures will be 1.2 m long and consist of 34 cells. A first 6 cell prototype structure has been tested successfully up to power levels of 100 MW (nominal: 30 MW), corresponding to surface electric field levels of 180 MV/m.CERN-PS-2002-068-RFCLIC-Note-538oai:cds.cern.ch:5813402002-09-16
spellingShingle Accelerators and Storage Rings
Jensen, E
CTF3 Drive Beam Accelerating Structures
title CTF3 Drive Beam Accelerating Structures
title_full CTF3 Drive Beam Accelerating Structures
title_fullStr CTF3 Drive Beam Accelerating Structures
title_full_unstemmed CTF3 Drive Beam Accelerating Structures
title_short CTF3 Drive Beam Accelerating Structures
title_sort ctf3 drive beam accelerating structures
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/581340
work_keys_str_mv AT jensene ctf3drivebeamacceleratingstructures