7th CLIC/CTF3 Collaboration Meeting

The seventh CTF3 collaboration meeting was held at CERN on 12th and 13th June 2002. Representatives from INFN-Frascati, LAL, RAL, SLAC, Uppsala University and CERN participated. The main focus was the work for the nominal phase, but also very spectacular results were reported from the preliminary ph...

Descripción completa

Detalles Bibliográficos
Autor principal: Rinolfi, Louis
Lenguaje:eng
Publicado: CERN 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/581485
_version_ 1780899461271126016
author Rinolfi, Louis
author_facet Rinolfi, Louis
author_sort Rinolfi, Louis
collection CERN
description The seventh CTF3 collaboration meeting was held at CERN on 12th and 13th June 2002. Representatives from INFN-Frascati, LAL, RAL, SLAC, Uppsala University and CERN participated. The main focus was the work for the nominal phase, but also very spectacular results were reported from the preliminary phase. Progress was reported on all activities. The design and layout studies are far advanced and very active hardware design and prototyping is going on. The construction of major systems has started. The major milestones for 2003 are the commissioning of the injector, the first part of the Drive Beam Accelerator and a 30 GHz high power RF source after the first four accelerator sections.
id cern-581485
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
publisher CERN
record_format invenio
spelling cern-5814852023-08-17T09:45:16Zhttp://cds.cern.ch/record/581485engRinolfi, Louis7th CLIC/CTF3 Collaboration MeetingAccelerators and Storage RingsThe seventh CTF3 collaboration meeting was held at CERN on 12th and 13th June 2002. Representatives from INFN-Frascati, LAL, RAL, SLAC, Uppsala University and CERN participated. The main focus was the work for the nominal phase, but also very spectacular results were reported from the preliminary phase. Progress was reported on all activities. The design and layout studies are far advanced and very active hardware design and prototyping is going on. The construction of major systems has started. The major milestones for 2003 are the commissioning of the injector, the first part of the Drive Beam Accelerator and a 30 GHz high power RF source after the first four accelerator sections.CERNCERN-OPEN-2002-055CLIC-Note-526oai:cds.cern.ch:5814852002
spellingShingle Accelerators and Storage Rings
Rinolfi, Louis
7th CLIC/CTF3 Collaboration Meeting
title 7th CLIC/CTF3 Collaboration Meeting
title_full 7th CLIC/CTF3 Collaboration Meeting
title_fullStr 7th CLIC/CTF3 Collaboration Meeting
title_full_unstemmed 7th CLIC/CTF3 Collaboration Meeting
title_short 7th CLIC/CTF3 Collaboration Meeting
title_sort 7th clic/ctf3 collaboration meeting
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/581485
work_keys_str_mv AT rinolfilouis 7thclicctf3collaborationmeeting