Electronics commissioning experience at HERA-B

The readout of HERA-B has been unified to a large extension. Only the HELIX and ASD8 chips with corresponding readout electronics were used and the data acquisition is constructed entirely with Sharc DSPs. This approach minimized the work load and was successful. The feedback of the ASD8 digital out...

Descripción completa

Detalles Bibliográficos
Autor principal: Schwingenheuer, Bernhard
Lenguaje:eng
Publicado: CERN 2001
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2001-005.40
http://cds.cern.ch/record/588633
_version_ 1780899602130534400
author Schwingenheuer, Bernhard
author_facet Schwingenheuer, Bernhard
author_sort Schwingenheuer, Bernhard
collection CERN
description The readout of HERA-B has been unified to a large extension. Only the HELIX and ASD8 chips with corresponding readout electronics were used and the data acquisition is constructed entirely with Sharc DSPs. This approach minimized the work load and was successful. The feedback of the ASD8 digital outputs to the analog inputs caused oscillations and the efforts to solve this problem still continued in the commissioning phase. The electronics of the sophisticated hardware trigger was commissioned successfully while some problems remain with the self-made 900 Mbit optical data transmission. (14 refs).
id cern-588633
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2001
publisher CERN
record_format invenio
spelling cern-5886332019-09-30T06:29:59Zdoi:10.5170/CERN-2001-005.40http://cds.cern.ch/record/588633engSchwingenheuer, BernhardElectronics commissioning experience at HERA-BDetectors and Experimental TechniquesThe readout of HERA-B has been unified to a large extension. Only the HELIX and ASD8 chips with corresponding readout electronics were used and the data acquisition is constructed entirely with Sharc DSPs. This approach minimized the work load and was successful. The feedback of the ASD8 digital outputs to the analog inputs caused oscillations and the efforts to solve this problem still continued in the commissioning phase. The electronics of the sophisticated hardware trigger was commissioned successfully while some problems remain with the self-made 900 Mbit optical data transmission. (14 refs).CERNoai:cds.cern.ch:5886332001
spellingShingle Detectors and Experimental Techniques
Schwingenheuer, Bernhard
Electronics commissioning experience at HERA-B
title Electronics commissioning experience at HERA-B
title_full Electronics commissioning experience at HERA-B
title_fullStr Electronics commissioning experience at HERA-B
title_full_unstemmed Electronics commissioning experience at HERA-B
title_short Electronics commissioning experience at HERA-B
title_sort electronics commissioning experience at hera-b
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.5170/CERN-2001-005.40
http://cds.cern.ch/record/588633
work_keys_str_mv AT schwingenheuerbernhard electronicscommissioningexperienceatherab