Cargando…

Progress in the construction of the B0 model of the ATLAS Barrel Toroid magnet

The ATLAS Barrel Toroid air-core magnet (BT) will be composed by 8 superconducting coils, each one 25 m long and 5 m wide. In order to validate the technologies and manufacturing processes, a smaller model (9 m long) of one BT coil, named B0, is now under construction. This paper presents a general...

Descripción completa

Detalles Bibliográficos
Autores principales: Acerbi, E, Alessandria, F, Ambrosio, G, Baccaglioni, G, Broggi, F, Rossi, L, Sorbi, M, Volpini, G
Lenguaje:eng
Publicado: 2000
Materias:
Acceso en línea:http://cds.cern.ch/record/588636
_version_ 1780899602772262912
author Acerbi, E
Alessandria, F
Ambrosio, G
Baccaglioni, G
Broggi, F
Rossi, L
Sorbi, M
Volpini, G
author_facet Acerbi, E
Alessandria, F
Ambrosio, G
Baccaglioni, G
Broggi, F
Rossi, L
Sorbi, M
Volpini, G
author_sort Acerbi, E
collection CERN
description The ATLAS Barrel Toroid air-core magnet (BT) will be composed by 8 superconducting coils, each one 25 m long and 5 m wide. In order to validate the technologies and manufacturing processes, a smaller model (9 m long) of one BT coil, named B0, is now under construction. This paper presents a general overview of the B0 project status, with special regard to the components for which the LASA Lab. is responsible: (a) the aluminium-clad NbTi conductor; (b) the double coils winding and impregnation; (c) the components of the cryostat (vacuum chamber, thermal shield and suspension rod). (6 refs).
id cern-588636
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2000
record_format invenio
spelling cern-5886362019-09-30T06:29:59Zhttp://cds.cern.ch/record/588636engAcerbi, EAlessandria, FAmbrosio, GBaccaglioni, GBroggi, FRossi, LSorbi, MVolpini, GProgress in the construction of the B0 model of the ATLAS Barrel Toroid magnetDetectors and Experimental TechniquesThe ATLAS Barrel Toroid air-core magnet (BT) will be composed by 8 superconducting coils, each one 25 m long and 5 m wide. In order to validate the technologies and manufacturing processes, a smaller model (9 m long) of one BT coil, named B0, is now under construction. This paper presents a general overview of the B0 project status, with special regard to the components for which the LASA Lab. is responsible: (a) the aluminium-clad NbTi conductor; (b) the double coils winding and impregnation; (c) the components of the cryostat (vacuum chamber, thermal shield and suspension rod). (6 refs).oai:cds.cern.ch:5886362000
spellingShingle Detectors and Experimental Techniques
Acerbi, E
Alessandria, F
Ambrosio, G
Baccaglioni, G
Broggi, F
Rossi, L
Sorbi, M
Volpini, G
Progress in the construction of the B0 model of the ATLAS Barrel Toroid magnet
title Progress in the construction of the B0 model of the ATLAS Barrel Toroid magnet
title_full Progress in the construction of the B0 model of the ATLAS Barrel Toroid magnet
title_fullStr Progress in the construction of the B0 model of the ATLAS Barrel Toroid magnet
title_full_unstemmed Progress in the construction of the B0 model of the ATLAS Barrel Toroid magnet
title_short Progress in the construction of the B0 model of the ATLAS Barrel Toroid magnet
title_sort progress in the construction of the b0 model of the atlas barrel toroid magnet
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/588636
work_keys_str_mv AT acerbie progressintheconstructionoftheb0modeloftheatlasbarreltoroidmagnet
AT alessandriaf progressintheconstructionoftheb0modeloftheatlasbarreltoroidmagnet
AT ambrosiog progressintheconstructionoftheb0modeloftheatlasbarreltoroidmagnet
AT baccaglionig progressintheconstructionoftheb0modeloftheatlasbarreltoroidmagnet
AT broggif progressintheconstructionoftheb0modeloftheatlasbarreltoroidmagnet
AT rossil progressintheconstructionoftheb0modeloftheatlasbarreltoroidmagnet
AT sorbim progressintheconstructionoftheb0modeloftheatlasbarreltoroidmagnet
AT volpinig progressintheconstructionoftheb0modeloftheatlasbarreltoroidmagnet