Cargando…

Status of the LHC low-$\beta$ insertion quadrupole magnet development at KEK

The development of the LHC low-beta insertion quadrupole magnets has been conducted at KEK since 1996. After the successful development of short model magnets, the first prototype magnet has been built by Toshiba and is tested at KEK. Although the quench performance and the field quality of the magn...

Descripción completa

Detalles Bibliográficos
Autores principales: Ogitsu, T, Nakamoto, T, Ohuchi, N, Ajima, Y, Burkhardt, E E, Higashi, N, Hirano, H, Lida, M, Kimura, N, Ohhata, H, Tanaka, K, Shintomi, T, Terashima, A, Tsuchiya, K, Yamamoto, A, Orikasa, T, Murai, S, Oosaki, O
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2002.1018379
http://cds.cern.ch/record/590808
_version_ 1780899653302091776
author Ogitsu, T
Nakamoto, T
Ohuchi, N
Ajima, Y
Burkhardt, E E
Higashi, N
Hirano, H
Lida, M
Kimura, N
Ohhata, H
Tanaka, K
Shintomi, T
Terashima, A
Tsuchiya, K
Yamamoto, A
Orikasa, T
Murai, S
Oosaki, O
author_facet Ogitsu, T
Nakamoto, T
Ohuchi, N
Ajima, Y
Burkhardt, E E
Higashi, N
Hirano, H
Lida, M
Kimura, N
Ohhata, H
Tanaka, K
Shintomi, T
Terashima, A
Tsuchiya, K
Yamamoto, A
Orikasa, T
Murai, S
Oosaki, O
author_sort Ogitsu, T
collection CERN
description The development of the LHC low-beta insertion quadrupole magnets has been conducted at KEK since 1996. After the successful development of short model magnets, the first prototype magnet has been built by Toshiba and is tested at KEK. Although the quench performance and the field quality of the magnet are satisfactory, a design problem is found in one of the end spacers. The problem increases the risk of a turn-to-turn and in fact causes shorts in the second prototype magnet, and in the trial coil of the first production magnet. The design is modified and the problem appears to be resolved. The construction of the production magnets is now started and lasts till the summer of 2004. (9 refs).
id cern-590808
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-5908082019-09-30T06:29:59Zdoi:10.1109/TASC.2002.1018379http://cds.cern.ch/record/590808engOgitsu, TNakamoto, TOhuchi, NAjima, YBurkhardt, E EHigashi, NHirano, HLida, MKimura, NOhhata, HTanaka, KShintomi, TTerashima, ATsuchiya, KYamamoto, AOrikasa, TMurai, SOosaki, OStatus of the LHC low-$\beta$ insertion quadrupole magnet development at KEKAccelerators and Storage RingsThe development of the LHC low-beta insertion quadrupole magnets has been conducted at KEK since 1996. After the successful development of short model magnets, the first prototype magnet has been built by Toshiba and is tested at KEK. Although the quench performance and the field quality of the magnet are satisfactory, a design problem is found in one of the end spacers. The problem increases the risk of a turn-to-turn and in fact causes shorts in the second prototype magnet, and in the trial coil of the first production magnet. The design is modified and the problem appears to be resolved. The construction of the production magnets is now started and lasts till the summer of 2004. (9 refs).oai:cds.cern.ch:5908082002
spellingShingle Accelerators and Storage Rings
Ogitsu, T
Nakamoto, T
Ohuchi, N
Ajima, Y
Burkhardt, E E
Higashi, N
Hirano, H
Lida, M
Kimura, N
Ohhata, H
Tanaka, K
Shintomi, T
Terashima, A
Tsuchiya, K
Yamamoto, A
Orikasa, T
Murai, S
Oosaki, O
Status of the LHC low-$\beta$ insertion quadrupole magnet development at KEK
title Status of the LHC low-$\beta$ insertion quadrupole magnet development at KEK
title_full Status of the LHC low-$\beta$ insertion quadrupole magnet development at KEK
title_fullStr Status of the LHC low-$\beta$ insertion quadrupole magnet development at KEK
title_full_unstemmed Status of the LHC low-$\beta$ insertion quadrupole magnet development at KEK
title_short Status of the LHC low-$\beta$ insertion quadrupole magnet development at KEK
title_sort status of the lhc low-$\beta$ insertion quadrupole magnet development at kek
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2002.1018379
http://cds.cern.ch/record/590808
work_keys_str_mv AT ogitsut statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT nakamotot statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT ohuchin statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT ajimay statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT burkhardtee statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT higashin statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT hiranoh statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT lidam statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT kimuran statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT ohhatah statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT tanakak statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT shintomit statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT terashimaa statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT tsuchiyak statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT yamamotoa statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT orikasat statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT murais statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek
AT oosakio statusofthelhclowbetainsertionquadrupolemagnetdevelopmentatkek