Cargando…

Construction and measurement of the pre-series twin aperture resistive quadrupole magnet for the LHC beam cleaning insertions

CERN's Large Hadron Collider (LHC) requires 48 twin aperture resistive quadrupoles in the beam cleaning insertions. Canada is contributing these magnets to CERN in the framework of the TRIUMF-LHC collaboration contracts. A pre-series magnet was produced by Canadian industry and delivered in Mar...

Descripción completa

Detalles Bibliográficos
Autores principales: de Rijk, G, Bidon, S, Boter, E, Clark, G S, Hans, O, Racine, M, Salinas, A
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2002.1018351
http://cds.cern.ch/record/590816
Descripción
Sumario:CERN's Large Hadron Collider (LHC) requires 48 twin aperture resistive quadrupoles in the beam cleaning insertions. Canada is contributing these magnets to CERN in the framework of the TRIUMF-LHC collaboration contracts. A pre-series magnet was produced by Canadian industry and delivered in March 2001. This magnet incorporates important design changes that resulted from experience with a prototype magnet. The construction of this pre-series magnet and the measurements made at ALSTOM and at CERN are reported. A comparison is made between high precision pole distance measurements and the magnetic measurements performed with a rotating coil mole. Conclusions for series production and possibilities for multipole corrections are outlined. (6 refs).