An Active Pre-Alignment System and Metrology Network for CLIC

The pre-alignment tolerance on the transverse positions of the components of the CLIC linacs is typically ten microns over distances of 200 m. Such tight tolerances cannot be obtained by a static one-time alignment because normal seismic ground movement and cultural noise associated with human and i...

Descripción completa

Detalles Bibliográficos
Autores principales: Becker, F, Coosemans, Williame, Pittin, R, Wilson, Ian H
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/604004
_version_ 1780900056072716288
author Becker, F
Coosemans, Williame
Pittin, R
Wilson, Ian H
author_facet Becker, F
Coosemans, Williame
Pittin, R
Wilson, Ian H
author_sort Becker, F
collection CERN
description The pre-alignment tolerance on the transverse positions of the components of the CLIC linacs is typically ten microns over distances of 200 m. Such tight tolerances cannot be obtained by a static one-time alignment because normal seismic ground movement and cultural noise associated with human and industrial activity quickly creates significant errors. It is therefore foreseen to maintain the components in place using an active-alignment system which will be linked to a permanent metrology and geodetic network. This report describes the overall philosophy and implementation of such a system and proposes one possible solution for active-alignment which uses stepping-motors to move components and stretched-wires as reference lines. Special sensors have been developed to measure the position of the components with respect to the reference lines, and to measure local tilt and relative vertical position. An in-depth analysis has been made of the repercussions on the alignment system of perturbing effects due to the attraction of the moon and the sun, and of the presence of nearby geological masses. The active-alignment system was used to maintain the components of the 30 GHz Two-Beam Test Accelerator in position in the CLIC Test Facility CTF2 as a practical demonstration of successful operation in an accelerator environment. The hardware and control system that was built for this application are described together with the results obtained.
id cern-604004
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-6040042023-08-17T09:45:19Zhttp://cds.cern.ch/record/604004engBecker, FCoosemans, WilliamePittin, RWilson, Ian HAn Active Pre-Alignment System and Metrology Network for CLICAccelerators and Storage RingsThe pre-alignment tolerance on the transverse positions of the components of the CLIC linacs is typically ten microns over distances of 200 m. Such tight tolerances cannot be obtained by a static one-time alignment because normal seismic ground movement and cultural noise associated with human and industrial activity quickly creates significant errors. It is therefore foreseen to maintain the components in place using an active-alignment system which will be linked to a permanent metrology and geodetic network. This report describes the overall philosophy and implementation of such a system and proposes one possible solution for active-alignment which uses stepping-motors to move components and stretched-wires as reference lines. Special sensors have been developed to measure the position of the components with respect to the reference lines, and to measure local tilt and relative vertical position. An in-depth analysis has been made of the repercussions on the alignment system of perturbing effects due to the attraction of the moon and the sun, and of the presence of nearby geological masses. The active-alignment system was used to maintain the components of the 30 GHz Two-Beam Test Accelerator in position in the CLIC Test Facility CTF2 as a practical demonstration of successful operation in an accelerator environment. The hardware and control system that was built for this application are described together with the results obtained.CERN-OPEN-2003-011CLIC-Note-553oai:cds.cern.ch:6040042003-01-28
spellingShingle Accelerators and Storage Rings
Becker, F
Coosemans, Williame
Pittin, R
Wilson, Ian H
An Active Pre-Alignment System and Metrology Network for CLIC
title An Active Pre-Alignment System and Metrology Network for CLIC
title_full An Active Pre-Alignment System and Metrology Network for CLIC
title_fullStr An Active Pre-Alignment System and Metrology Network for CLIC
title_full_unstemmed An Active Pre-Alignment System and Metrology Network for CLIC
title_short An Active Pre-Alignment System and Metrology Network for CLIC
title_sort active pre-alignment system and metrology network for clic
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/604004
work_keys_str_mv AT beckerf anactiveprealignmentsystemandmetrologynetworkforclic
AT coosemanswilliame anactiveprealignmentsystemandmetrologynetworkforclic
AT pittinr anactiveprealignmentsystemandmetrologynetworkforclic
AT wilsonianh anactiveprealignmentsystemandmetrologynetworkforclic
AT beckerf activeprealignmentsystemandmetrologynetworkforclic
AT coosemanswilliame activeprealignmentsystemandmetrologynetworkforclic
AT pittinr activeprealignmentsystemandmetrologynetworkforclic
AT wilsonianh activeprealignmentsystemandmetrologynetworkforclic