Cargando…
Commissioning of a Bunch Frequency Monitor for the CTF3 Preliminary Phase
The CTF3 preliminary phase at CERN has demonstrated the feasibility of the bunch frequency multiplication process, by injection of subsequent bunch trains into an isochronous ring. In order toobserve the bunch interleaving at each stage of this process, a new method based on frequency spectrum analy...
Autores principales: | Ferrari, A, Rydberg, A, Caspers, Friedhelm, Corsini, R, Rinolfi, Louis, Royer, P, Tecker, T |
---|---|
Lenguaje: | eng |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/607746 |
Ejemplares similares
-
Development of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3
por: Caspers, Friedhelm, et al.
Publicado: (2003) -
Status of the CTF3 commissioning
por: Corsini, R, et al.
Publicado: (2002) -
Bunch Frequency Multiplication in the CLIC Test Facility CTF3
por: Tecker, F A, et al.
Publicado: (2003) -
Status of the CTF3 commissioning
por: Corsini, R, et al.
Publicado: (2002) -
Beam Dynamics for the CTF3 Preliminary Phase
por: Corsini, R, et al.
Publicado: (2001)