Cargando…

Workshop on LHC performance

The workshop in 2003 was the second in the series devoted to the LHC and was composed of 11 half day sessions. It started with a session devoted to the injector chain which was followed by a session devoted to ions throughout the whole facility. The second day reviewed issues relating to the LHC mag...

Descripción completa

Detalles Bibliográficos
Autor principal: Poole, John
Lenguaje:eng
Publicado: CERN 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/612793
_version_ 1780900260782014464
author Poole, John
author_facet Poole, John
author_sort Poole, John
collection CERN
description The workshop in 2003 was the second in the series devoted to the LHC and was composed of 11 half day sessions. It started with a session devoted to the injector chain which was followed by a session devoted to ions throughout the whole facility. The second day reviewed issues relating to the LHC magnets and installation and hardware commissioning. On the Wednesday issues concerning operation with unprecedented beam energy and the controls which will be required for safe operation were presented. Thursday's sessions were devoted to machine commissioning and on Friday the susceptibility to mains disturbances and vacuum issues were examined. In the final session on the Saturday morning, outstanding issues were discussed and the decisions resulting from the week were recorded. Summaries of the ten sessions were presented at CERN in the week following the workshop.
id cern-612793
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
publisher CERN
record_format invenio
spelling cern-6127932021-07-30T13:18:55Zhttp://cds.cern.ch/record/612793engPoole, JohnWorkshop on LHC performanceAccelerators and Storage RingsThe workshop in 2003 was the second in the series devoted to the LHC and was composed of 11 half day sessions. It started with a session devoted to the injector chain which was followed by a session devoted to ions throughout the whole facility. The second day reviewed issues relating to the LHC magnets and installation and hardware commissioning. On the Wednesday issues concerning operation with unprecedented beam energy and the controls which will be required for safe operation were presented. Thursday's sessions were devoted to machine commissioning and on Friday the susceptibility to mains disturbances and vacuum issues were examined. In the final session on the Saturday morning, outstanding issues were discussed and the decisions resulting from the week were recorded. Summaries of the ten sessions were presented at CERN in the week following the workshop.CERNCERN-AB-2003-008-ADMoai:cds.cern.ch:6127932003
spellingShingle Accelerators and Storage Rings
Poole, John
Workshop on LHC performance
title Workshop on LHC performance
title_full Workshop on LHC performance
title_fullStr Workshop on LHC performance
title_full_unstemmed Workshop on LHC performance
title_short Workshop on LHC performance
title_sort workshop on lhc performance
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/612793
work_keys_str_mv AT poolejohn workshoponlhcperformance